文章摘要
曹谦,陈文琳,周永锋,等.轨道交通用减震器座锻造成形工艺改进[J].精密成形工程,2019,11(2):28-34.
CAO Qian,CHEN Wen-lin,ZHOU Yong-feng,et al.Forging Forming Process Improvement of Railway Shock Absorber Base[J].Journal of Netshape Forming Engineering,2019,11(2):28-34.
轨道交通用减震器座锻造成形工艺改进
Forging Forming Process Improvement of Railway Shock Absorber Base
投稿时间:2019-02-15  修订日期:2019-03-10
DOI:10.3969/j.issn.1674-6457.2019.02.005
中文关键词: 减震器座  锻造  一模两件
英文关键词: absorber base  forging  two pieces in one module
基金项目:
作者单位
曹谦 1. 合肥工业大学 材料科学与工程学院合肥 230009 
陈文琳 1. 合肥工业大学 材料科学与工程学院合肥 230009 
周永锋 2. 安徽金正达精锻科技有限责任公司安徽 全椒 239500 
周洋 2. 安徽金正达精锻科技有限责任公司安徽 全椒 239500 
申志勇 2. 安徽金正达精锻科技有限责任公司安徽 全椒 239500 
摘要点击次数: 3382
全文下载次数: 2503
中文摘要:
      目的 针对原有锻造工艺在终锻时易出现折叠和材料利用率较低的问题,改进锻造成形工艺,消除缺陷并提高材料利用率。方法 以某型号轨道交通用减震器座为研究对象,对减震器座进行工艺分析、计算和有限元模拟。在原有工艺上增加拍扁工步,并设计了两种一模两件式的锻造工艺。对改进后的工艺方案进行有限元数值模拟,对比两种方案的金属流动、载荷、应力应变的分布情况。结果 改进后的成形方案在避免折叠缺陷的前提下,材料利用率分别从70%提高到82%和86%。结论 锻件型腔非对称放置时,载荷较低,速度更均匀,整体等效应变较小,有利于模具寿命。一模两件锻造的方式虽然增加了设备吨位,但是改善了金属流动,避免了汇流、折叠的缺陷,提高材料利用率和生产率,对于类似形状锻件的锻造工艺开发具有指导作用。
英文摘要:
      In allusion to issues of folding and low material utilization of existing forging process, the paper aims to improve forging forming process based on researching a certain model of railway shock absorber base. Process analysis, calculation and finite element simulation were carried out on the shock absorber base, the preforming process and two forging process of two pieces in one module were designed. Numerical simulation of finite element was carried out on the improved process programs. Metal flow, load and equivalent strain distribution was obtained. On the premise of avoiding folding defect, the new forging process improved the material utilization rate from 70% to 82% and 86%. When the cavities are place asymmetrically, the forging load and equivalent strain is low, the metal flow is uniform and these are beneficial for mold. Although the forging process of two pieces in one module increases the forging load, it avoids folding, improves material utilization and productivity. It is guiding to development of forging process for forgings of similar shapes.
查看全文   查看/发表评论  下载PDF阅读器
关闭

关于我们 | 联系我们 | 投诉建议 | 隐私保护 | 用户协议

您是第12279059位访问者    渝ICP备15012534号-6

>版权所有:《精密成形工程》编辑部 2014 All Rights Reserved

>邮编:400039 电话:023-68679125传真:02368792396 Email: jmcxgc@163.com

>    

渝公网安备 50010702501719号